PUBLICATIONS

PAPER

HOME > Publications > Paper
Predictive maintenance system for membrane replacement time detection: Application to a full-scale MBR plant
  • 관리자
  • |
  • 139
  • |
  • 2023-02-02

TaeYong Woo†, KiJeon Nam†, SungKu Heo, Juin Yau Lim, SangYoun Kim , and ChangKyoo Yoo*, Predictive maintenance system for membrane replacement time detection: Application to a full-scale MBR plant, Journal of Membrane Science (ISSN: ISSN: 0376-7388, IF=8.7, JCR  Top 3.4%), 649(5), pp.120400 (2022.5) (Ack: NRF- 2021R1A2C2007838& Climate Change Graduate School) (Editor’s choice-Cover paper) 

이전글 A cost-benefit analysis of Bakhtiari hydropower dam considering the nexus between energy and water
다음글 Shallow Fully Connected Neural Network Training by Forcing Linearization into Valid Region and Balancing Training Rates