Predictive maintenance system for membrane replacement time detection: Application to a full-scale MBR plant | ||
---|---|---|
|
||
TaeYong Woo†, KiJeon Nam†, SungKu Heo, Juin Yau Lim, SangYoun Kim , and ChangKyoo Yoo*, Predictive maintenance system for membrane replacement time detection: Application to a full-scale MBR plant, Journal of Membrane Science (ISSN: ISSN: 0376-7388, IF=8.7, JCR Top 3.4%), 649(5), pp.120400 (2022.5) (Ack: NRF- 2021R1A2C2007838& Climate Change Graduate School) (Editor’s choice-Cover paper) |
||
이전글 | A cost-benefit analysis of Bakhtiari hydropower dam considering the nexus between energy and water | |
다음글 | Shallow Fully Connected Neural Network Training by Forcing Linearization into Valid Region and Balancing Training Rates |